Buildings and Grounds Committee |
|||||
|
Larry Bargy |
Michael
Crawford, Chairman |
Eugene
Dawson |
|||
|
|
|||||
|
|
|||||
|
Minutes |
|||||
|
|
|||||
|
Members present: |
|
|
|||
|
Members absent: |
|
None |
|||
|
Others present: |
|
Pete Garwood and Jack White |
|||
|
|
|||||
|
1. Meeting
called to order at |
|||||
|
2. Maintenance Department Update |
|||||
|
|
Dave
Vitale, Maintenance Supervisor, informed the Committee there is water in the
bottom of the elevator shaft at the 1905 Courthouse. He thinks it is caused by the heavy rains
we have experienced lately. Mr.
Vitale will keep an eye on the shaft and inform the Committee if there are
further problems. |
||||
|
|
Mullion
bars (weather stripping) have been installed on the Courthouse doors. |
||||
|
|
The tree
next to the |
||||
|
|
²
Picnic Tables at |
||||
|
|
Mr.
Vitale informed the Committee that he has seen the new picnic tables at |
||||
|
3. |
|||||
|
|
Mr.
Garwood explained the work, by Northern Waterproofing and Restoration on the
outside panels of the |
||||
|
|
The
Committee directed Mr. Garwood to make sure all repairs and improvements to
the |
||||
|
4. Office Space |
|||||
|
|
²
Register of Deeds |
||||
|
|
Patty Niepoth, Register of Deeds, provided the committee with
quotes for changing walls in her office.
The total cost would be less than $3,000. |
||||
|
|
Motion by
|
||||
|
5. 1905 Courthouse |
|||||
|
|
²
|
||||
|
|
No new
information. |
||||
|
|
²
Attic Insulation |
||||
|
|
Mr.
Crawford informed the Committee the Coordinator/Planner Office has purchased
blue board to insulate the attic in the Courthouse. The Maintenance Department was unable to
install the blueboard. Crawford Construction will install the blueboard. Due to
the impending winter, the installation of the blueboard
will be done on an emergency basis. |
||||
|
|
The Committee
directed Mr. Garwood to get a quote for re-caulking around all the windows on
the 1905 Courthouse (for the spring of 2004). |
||||
|
6. Animal Shelter Update |
|||||
|
|
Bob Yvon, Architect, and Pat Weisler,
Petrie Construction, joined the meeting. |
||||
|
|
Mr. Weisler has called for an inspection from the Department
of Agriculture. A representative will
be there Thursday or Friday. Other stuff
scheduled includes: flooring, finishing, painting, and installing glass on a
couple of the doors. The shelter
should be completed by mid-December.
Asphalt will likely be laid next spring. The gravel base has been laid and
compacted. |
||||
|
|
A part
of the sidewalk curb has been damaged. Mr. Weisler
stated that the paving company was responsible and it will be fixed in the
spring. |
||||
|
7. |
|||||
|
|
There
was nothing to report on the electrical meter box at this time. Undersheriff Dan
Bean indicated they are still working on getting quotes for putting the
entire building on one electric meter. |
||||
|
8. Display Case |
|||||
|
|
Mr.
Crawford informed the Committee he has contacted Twin Bay Glass for a quote
to build a display case for county historic artifacts. Mr. Bob Yvon
suggested contacting Eye Wood Cabinet Builders also. |
||||
|
Meeting
adjourned at |
|||||