Buildings and Grounds Committee |
|||||
|
Larry Bargy |
Michael
Crawford, Chairman |
Eugene
Dawson |
|||
|
|
|||||
|
|
|||||
|
Minutes |
|||||
|
|
|||||
|
Members present: |
|
Mike Crawford, Larry Bargy and
|
|||
|
Members absent: |
|
None |
|||
|
Others present: |
|
Pete Garwood |
|||
|
|
|||||
|
1. Meeting
called to order at |
|||||
|
2. Maintenance Department Update |
|||||
|
|
Dave
Vitale, Maintenance Supervisor came in to give the Maintenance Department
report. |
||||
|
|
Mr.
Vitale presented the Committee with a quote for moving the light fixtures in
each of the stairwells. The current
fixtures are dangerous to service. The
quote from Sky Electric is for $480 per stairwell. The Committee will review the stairwell
lighting. |
||||
|
|
·
Treads have been installed on the stairs in the 1905 Courthouse. ·
The cable brace has been refastened to the stack on top of the ·
·
Communication tower on Orchard Hill has been painted. ·
Faucet in the ladies restroom in the 1905 Courthouse has been
replaced with an adjustable gooseneck faucet. ·
Many doors on the ·
Window in the Prosecuting Attorney Office has been caulked and the
lock has been replaced. |
||||
|
3. Removal of Maple Trees |
|||||
|
|
Mr.
Vitale presented a quote from Todd’s Tree Service for removal of the two
partially dead maple trees on the north side of the 1905 Courthouse. |
||||
|
|
Motion by
|
||||
|
4. Building Maintenance Ledger |
|||||
|
|
The
Committee as well as Mr. Vitale reviewed the building maintenance ledger, a
product of a facility review by Mike Crawford, Arlen Turner, and
|
||||
|
|
The
Committee reviewed insulation quotes for the 1905 Courthouse attic. |
||||
|
|
Committee
will get quotes on blue board sealed with foam for the attic of the 1905
Courthouse, with OSB board laid on top for walking paths. |
||||
|
5. Animal Shelter Update |
|||||
|
|
Motion by
|
||||
|
|
Bob
Yvon, Architect, and Pat Weisler, Contractor, joined the meeting. |
||||
|
|
Mr. Weisler
informed the Committee he is waiting for the windows to be delivered to get
the outside of the building completed. |
||||
|
|
Sheriff
Johnson recommended Mr. Yvon contact the Department of Agriculture for some
pre-inspections. Mr. Yvon agreed it
would be a good idea. |
||||
|
|
The
Committee inquired of Mr. Yvon why the electrical was not included in the bid
specifications. Mr. Yvon indicated
that because it is a new site with many unknowns it would have been nearly
impossible for the contractors to bid on the electrical. Consequently it was left out. |
||||
|
|
˛
Consumers Energy Invoice The
Committee directed Mr. Garwood to see if he can get the cost reduced by
proposing to Consumers Energy a more direct route to the transformer. |
||||
|
6. |
|||||
|
|
Mr.
Garwood informed the Committee that the County was approached with an offer to
purchase property across |
||||
|
7. |
|||||
|
|
·
Roof Replacement - To be started next week. ·
Septic System Update –Scheduled for Monday, September 8. |
||||
|
8. Office Space Update |
|||||
|
|
The
Committee agreed the office space remodeling program was low on the priority
list compared to the exterior work that needs to be done on both the |
||||
|
|
Patti
Niepoth, Register of Deeds joined the meeting. The Committee directed Mr. Garwood to
contact Dave Vitale and inquire whether he and his crew can remove a wall
between the Register of Deeds Office and the old Veterans Affairs Office. |
||||
|
Meeting
adjourned at |
|||||